Progress at Fairmount

By Cassandra Gillespie 05 Apr, 2022
The Fairmount home is quickly coming along: right now we're working on the custom staircase to the back deck.
By Cassandra Gillespie 21 Mar, 2022
We are doing a seamless floor to ceiling installation of lime plaster in the primary suite. Since limestone is resistant to mold, mildew, and bacteria this bathroom is just about as low maintenance as you can get.
By Cassandra Gillespie 07 Feb, 2022
The Fairmount High Performance home is moving along - the floors are in!
By Cassandra Gillespie 30 Sep, 2021
We hosted around 45 high performance enthusiasts to our Fairmount property for a walk-thru and discussion on several crucial ingredients that go into a home of this caliber.
By Kala 15 Sep, 2021
Learn more about the air sealing process using AeroBarrier sealant at Kala's Fairmount High Performance Home.
By Kala 02 Sep, 2021
The concrete crew put the finishing touches on the driveway at the Farimount High Performance Home.
By Kala 31 Aug, 2021
Radiant heat automatically controlled based on the current climate keeps the slab tempered and the driveway free of ice and snow.
Man holding solar panel on metal roof
By Kala 27 Jul, 2021
Kala Performance Homes recently installed a 14 KW solar array to the Fairmount project - a high performance home in the West Plaza.
By Kala 14 Jul, 2021
Nobody really wants to talk about toilets but there are better, ahem, solutions...
By Kala 29 Jun, 2021
All steel ductwork, insulated from the outside, and sealed to .05 static pressure helps keep the air in the house pure
Show More
Share by: